November 15, 2026
Knowing what happens on installation day makes a timber floor project easier to plan. This guide walks through timber flooring installation step by step, from the measure to the first week of living on your new floor. It focuses on engineered timber, the most common timber floor we install, with notes on solid timber. For how floating, glued and nailed methods differ, see our guide to floating timber floors.

A measure confirms the room sizes, checks the subfloor’s level and moisture, and notes doorways, stairs and transitions to other floors. The written quote covers the flooring, underlay or adhesive, trims, preparation and installation. See what is included in your quote.
The method depends on the product and the subfloor:
Our engineered vs solid timber guide explains the two types of board.
Timber is a natural material that responds to the humidity of the room. Makers such as Swish say boards need to acclimatise before laying, so they are delivered ahead of time and left in the rooms where they will go, in their packs, as the installation guide directs. Keep the house at normal living conditions during this time.
The subfloor must be flat, sound and dry. That can mean grinding high spots, filling dips, levelling compound or fixing loose boards. Our subfloor preparation guide covers this step in full.
On concrete, a moisture barrier goes down first. For Royal timber ranges our installation guide requires a 200 µm plastic moisture barrier with taped joins under floating installs, and a moisture barrier under glued installs too. Floating floors then go over the specified underlay.
Boards go down row by row with the end joins staggered so they do not line up. Floating boards are clicked together; glued boards are pressed into adhesive spread with a trowel. Door frames are usually undercut so boards slide underneath for a clean finish. Herringbone and chevron patterns take longer, as each board is set from a centre line. See our herringbone vs chevron guide.
It depends on the area, the method, the pattern and how much preparation the subfloor needs. A straightforward floating floor in a few rooms is faster than a glued herringbone through a whole house. Your quote will set out the expected timing.
Browse our timber flooring range, visit a showroom in Penrith, Campbelltown, Hornsby or Logan, or book a free measure and quote.
Yes. Timber responds to room humidity, so makers such as Swish say boards need to acclimatise before laying. Follow the time and conditions in the installation guide for your range.
Some can, but not all. Royal Aus Timber 14/3mm, for example, is floating or glued only. Check the installation guide for your range.
On concrete, yes. For Royal timber ranges a 200 µm plastic moisture barrier goes under floating installs, and glued installs need a moisture barrier too.
Sometimes. The new floor may be higher than the old one, so doors are checked and trimmed if needed after installation.
For floating floors, usually yes, with felt pads fitted first. For glued floors, follow the adhesive maker’s guide on curing time.
Four showrooms across Sydney & Brisbane