New Flooring Before Christmas: Your Simple Timeline

October 10, 2026

Picture Christmas lunch on fresh new floors. If that is the plan, the earlier you start, the more choice you have of products and installation dates. This guide sets out a simple timeline for new flooring before Christmas, how long each type of floor takes to install, what can add time, and how to get your home ready.

New flooring before Christmas: Royal 14/2mm Oak engineered timber in a bright bedroom

Your new flooring before Christmas timeline

Work back from the date you want the floors finished. As a guide:

  1. 8 to 10 weeks before: choose your floor. Visit a showroom, compare samples and narrow down your favourites. Bring photos of your rooms and any cabinet or paint samples.
  2. 6 to 8 weeks before: book a free measure and quote. We measure every room, check the subfloor and give you a written quote that includes any preparation.
  3. 5 to 6 weeks before: confirm and lock in a date. The earlier you confirm, the more installation dates you can choose from, and the more time there is to order stock.
  4. 1 to 2 weeks before: prepare the space. Plan where furniture will go, book any trades that need to come before or after, and clear small items.
  5. Install day. Most rooms are finished in a day or two. Then it is time to deck the halls.

If you are in a strata building, add time for approval before you book a date. Our strata approval guide walks through the steps.

How long does installation take?

Timing depends on the size of your project and the condition of your subfloor, but as a guide:

FlooringTypical installation timeNotes
Hybrid1 to 2 daysFloating floor, so it can be walked on straight away
Laminate1 to 2 daysFloating floor over underlay
Vinyl plank1 to 2 daysGlue-down vinyl needs a smooth subfloor first
CarpetUsually 1 dayUnderlay and carpet go down together
Engineered timber1 to 3 daysDepends on size, pattern and whether it is glued or floated

We confirm your timeline during your measure and quote.

What can add time?

  • Removing old flooring. Lifting tiles, glued vinyl or old timber takes longer than lifting carpet. Our guide to laying new flooring over tiles explains when tiles can stay.
  • Levelling the subfloor. Floors need a flat base. Levelling compound needs time to dry before the floor goes down.
  • Moisture in the slab. Concrete must be dry enough for the product. A new or recently wet slab may need testing and a moisture barrier. See flooring over concrete slabs.
  • Patterns and stairs. Herringbone, chevron and stair work take more time than straight planks.
  • Other trades. Painting, kitchen work and skirting changes need to be scheduled around the floor.

Tips to beat the Christmas rush

  • Start early. November and December are busy months for renovations.
  • Measure once, properly. A professional measure avoids ordering too much or too little.
  • Do several rooms at once. One installation gives a seamless look and less disruption.
  • Ask about preparation. Knowing about levelling or removal up front keeps your date on track.
  • Keep a back-up colour. If your first choice is short, a second favourite saves weeks.

Our guide to the free measure and quote explains what happens on the day.

Getting your home ready

  • Clear the rooms of small items, rugs and anything fragile. Ask us about moving larger furniture.
  • Make sure we can get in easily, with parking and a clear path for materials.
  • Plan where pets and kids will be on the day.
  • Keep the home at a normal temperature, and follow any product guide that asks for boxes to sit in the home before installation.

Popular floors for the festive season

Hosting a crowd? Waterproof Royal 6.5mm Premium hybrid copes with spilt drinks and busy feet. For bedrooms, soft Freedom triexta carpet has stain resistance built into the fibre and cleans with cold water. For real timber warmth, Royal 14/2mm Oak engineered oak suits living and dining areas. For festive spills on carpet, keep our carpet care guide handy.

Get started today

The sooner you start, the more choice you have. Visit Royal Floors in Penrith, Campbelltown, Hornsby or Logan, or book a free measure and quote and we will bring samples to your home.

Frequently asked questions

Is it too late to get new floors before Christmas?

It depends on the project and how quickly you confirm. Book a free measure and quote as early as you can so you have the widest choice of products and installation dates.

How long does it take to install new flooring?

Most hybrid, laminate, vinyl and carpet projects take one to two days. Engineered timber can take one to three days, depending on size, pattern and subfloor.

Do I need to move my furniture?

Rooms need to be clear for installation. Ask about furniture during your measure and quote.

Can I walk on new floors straight away?

Floating floors such as hybrid and laminate can usually be walked on once installed, and carpet straight away. Glue-down floors may need time for the adhesive to set, so check your installer’s advice.

What slows a flooring project down?

Removing old flooring, levelling the subfloor, moisture in a concrete slab, strata approval and patterns or stairs. We flag these at the measure so there are no surprises.

Explore our flooring and carpet ranges and get ready for a Christmas to remember.