Picture Christmas lunch on fresh new floors. If that is the plan, October is the time to start. Here is a simple timeline for getting new flooring before Christmas, from choosing your floor to the day it goes down.

Timing depends on the size of your project and the condition of your subfloor, but as a guide:
| Flooring | Typical installation time |
|---|---|
| Hybrid | 1–2 days |
| Laminate | 1–2 days |
| Vinyl plank | 1–2 days |
| Carpet | Usually 1 day |
| Engineered timber | 1–3 days |
Our guide to preparing your space for a measure and quote explains what to expect on the day.
Hosting a crowd? Waterproof Royal 6.5mm Premium hybrid shrugs off spilt drinks. For bedrooms, soft Freedom triexta carpet cleans with cold water. For a touch of luxury, Royal 14/2mm Oak brings real European Oak warmth.
The sooner you start, the more choice you have. Visit Royal Floors in Penrith, Campbelltown, Hornsby or Logan, or book a free measure and quote and we will bring the samples to you.
Not if you start in October. Book a free measure and quote early so you have the widest choice of installation dates.
Most hybrid, laminate, vinyl and carpet projects take one to two days. Engineered timber can take one to three days, depending on size and subfloor.
Rooms need to be clear for installation. Ask about furniture during your measure and quote.
Explore our flooring and carpet ranges and get ready for a Christmas to remember.