New Flooring Before Christmas: Your Simple Timeline

October 10, 2026

Picture Christmas lunch on fresh new floors. If that is the plan, October is the time to start. Here is a simple timeline for getting new flooring before Christmas, from choosing your floor to the day it goes down.

New flooring before Christmas: Royal 14/2mm Oak engineered timber in a bright bedroom

Your new flooring before Christmas timeline

  • Early to mid October: choose your floor. Visit a showroom, compare samples and narrow down your favourites.
  • October: book a free measure and quote. We measure every room, check the subfloor and give you an accurate quote.
  • Late October to November: confirm and lock in a date. The earlier you confirm, the more installation dates you can choose from.
  • Before install day: prepare the space. Clear the rooms and plan where furniture will go.
  • Install day: enjoy the transformation. Most rooms are finished in a day or two.

How long does installation take?

Timing depends on the size of your project and the condition of your subfloor, but as a guide:

FlooringTypical installation time
Hybrid1–2 days
Laminate1–2 days
Vinyl plank1–2 days
CarpetUsually 1 day
Engineered timber1–3 days
We confirm your timeline during your measure and quote.

Tips to beat the Christmas rush

  • Start early. November and December are busy months for renovations.
  • Measure once, properly. A professional measure avoids ordering too much or too little.
  • Think about the whole home. Doing several rooms at once gives a seamless look.
  • Ask about floor preparation. Levelling or removing old flooring can add time.

Our guide to preparing your space for a measure and quote explains what to expect on the day.

Popular floors for the festive season

Hosting a crowd? Waterproof Royal 6.5mm Premium hybrid shrugs off spilt drinks. For bedrooms, soft Freedom triexta carpet cleans with cold water. For a touch of luxury, Royal 14/2mm Oak brings real European Oak warmth.

Get started today

The sooner you start, the more choice you have. Visit Royal Floors in Penrith, Campbelltown, Hornsby or Logan, or book a free measure and quote and we will bring the samples to you.

A few of our favourite shades

Frequently asked questions

Is it too late to get new floors before Christmas?

Not if you start in October. Book a free measure and quote early so you have the widest choice of installation dates.

How long does it take to install new flooring?

Most hybrid, laminate, vinyl and carpet projects take one to two days. Engineered timber can take one to three days, depending on size and subfloor.

Do I need to move my furniture?

Rooms need to be clear for installation. Ask about furniture during your measure and quote.

Explore our flooring and carpet ranges and get ready for a Christmas to remember.

Seasonal Deals Are Here!

Enjoy royal savings on our exclusive seasonal offers.

Where great floors begin, Visit us at

Sydney & Brisbane

CAMPBELLTOWN

02 8605 1900

LOGAN QLD

0457 770 261